Scoping metallurgical tests reported at Camp Creek
Brixton released initial metallurgical test results on material from three zones of the Camp Creek system at its wholly owned Thorn project.
Read announcementDated company and project developments, with links to the original announcements.
Brixton released initial metallurgical test results on material from three zones of the Camp Creek system at its wholly owned Thorn project.
Read announcementHole AN-26-17 returned 302.05 metres at 1.73% lithium oxide from 295.25 metres downhole. The reported interval is a drill length.
Read announcementScottie reported additional 2026 drill results from the Blueberry Contact Zone, including infill drilling at the Lemoffe veins.
Read announcement