Germanium re-analysis results released for Ballywire
Group Eleven reported results from a second batch of previously drilled intervals analysed using a higher-accuracy germanium assay method.
Read announcementDated company and project developments, with links to the original announcements.
Group Eleven reported results from a second batch of previously drilled intervals analysed using a higher-accuracy germanium assay method.
Read announcementQ2 published the first conceptual assessment of staged development at Cisco. The company also described ongoing drilling, engineering and metallurgical studies.
Read announcementThe company reported a revised repayment date of 9 February 2027 after partially repaying the facility.
Read announcementBrixton released initial metallurgical test results on material from three zones of the Camp Creek system at its wholly owned Thorn project.
Read announcementHole AN-26-17 returned 302.05 metres at 1.73% lithium oxide from 295.25 metres downhole. The reported interval is a drill length.
Read announcementScottie reported additional 2026 drill results from the Blueberry Contact Zone, including infill drilling at the Lemoffe veins.
Read announcementIn its Canadian release, Benz reported results from 68 reverse-circulation holes totalling 25,776 metres at the Icon camp within Glenburgh.
Read announcement